Skip to main content
Call (830) 555-0147Get a free quote
Stucco house with a drought-tolerant front garden of cactus and grasses, San Marcos

Hays County · 3 completed projects

Landscaping in San Marcos

San Marcos is growing fast, and most of the yards we're called to are new: builder lots in Kissing Tree, Blanco Vista and the subdivisions along the I-35 corridor, with a strip of sod, three shrubs and a drainage problem nobody mentioned at closing. West of town, on the hills off Ranch Road 12, the ground and the work change completely.

We've completed projects across San Marcos, from water-wise front yards approved by strict HOAs to dry creek beds that carry an uphill neighbor's runoff around a patio, and decks that look west over the Hill Country.

Local conditions

What shapes a San Marcos yard

Soil

East of the escarpment, San Marcos soils are dense blackland clay. They hold nutrients well and drain slowly, which is why so many new lawns here stay soggy for days after rain and crack open in August. West of town the soil thins out over limestone, with the same caliche and rock we see in Boerne and Helotes.

Terrain and slope

San Marcos sits where the Balcones Escarpment meets the river, and the city has a long history of flash flooding. Many neighborhoods have drainage easements, detention areas and lots that slope toward each other. We study where water enters and leaves your yard before we design anything, and we keep new work out of mapped floodplain areas where rules restrict building.

Much of the area west of I-35 lies over the Edwards Aquifer recharge and contributing zones, which can bring extra rules on grading, impervious cover and how runoff is handled. We check your lot before we plan large hardscape.

HOAs and permits

Kissing Tree, Blanco Vista, La Cima and other planned communities have architectural committees with detailed standards for front yards, plant lists, fences and lighting. Our Kissing Tree xeriscape was approved in one round because the submission answered every question before the committee asked it.

Water restrictions

The City of San Marcos sets drought stages tied to the Edwards Aquifer, with assigned watering days and limited hours for sprinklers in stricter stages, and more allowance for drip. Many of our San Marcos clients choose xeriscaping to stay green on those schedules.

Completed here

Projects in San Marcos

  • San Marcos · West of Ranch Road 12 · 2025

    Hilltop deck and path lights

    A 360 sq ft cedar deck on a hillside lot west of town with Hill Country views, plus 14 path lights on the walk to the drive.

    Decks · Path and step lighting · $40,000–$55,000

  • San Marcos · Kissing Tree · 2024

    HOA-approved xeriscape

    Front and side lawns replaced with decomposed granite, boulders and native beds, approved by the HOA's architectural committee in one round.

    Xeriscaping · Drip irrigation · $25,000–$35,000

  • San Marcos · Blanco Vista · 2023

    Backyard dry creek bed

    A 70 ft dry creek bed and 40 ft French drain carrying runoff from an uphill neighbor around a patio and out to the drainage easement.

    French drains and dry creek beds · Grading and erosion control · $12,000–$18,000

Google reviews

What San Marcos clients say

  • Our HOA is strict and they prepared everything the committee asked for. Approved in one round. The new yard takes almost no water and still looks green and planted. Good communication from start to finish.

    Jim B. · San Marcos · Google review
  • Water from the lot above ours used to run straight across our patio. The dry creek bed they built carries it around to the easement and looks like it has always been there. The May storms proved it works.

    Sofia R. · San Marcos · Google review

San Marcos is about 25 minutes up I-35 from our yard. If drainage is the problem, send photos or a video from the last storm when you book your site walk; seeing where the water goes saves a lot of guessing.

Free · 45 minutes · no obligation

Book a free site walk in San Marcos

Forty-five minutes on your property with a designer. You'll leave with honest numbers and a clear next step. A fixed-price proposal with a 3D render follows within two weeks.