Skip to main content
Call (830) 555-0147Get a free quote
Flagstone stepping-stone walk through low planting, Canyon Lake

Hardscaping · from $22–$40 per sq ft

Walkways and garden paths in Canyon Lake and New Braunfels

A walkway should go where people actually walk. Look at any yard and you'll find the real path worn into the grass, usually from the driveway to the front door at a diagonal, or from the back door straight to the gate. We design walkways along those lines, wide enough for two people side by side, with steps where the grade needs them.

We build front walks in mortared flagstone or cut limestone, garden paths in dry-laid flagstone or stabilized decomposed granite, and hillside steps from solid limestone slabs. Every one sits on compacted base and is sloped so water sheds off, not along it.

Who it's for

Who this is for

Homes where guests cut across the lawn because the walk goes the long way. Hillside lots in Canyon Lake, Boerne and Helotes that need safe steps down to a patio, pool or lake. Older walks that have heaved, cracked or hold puddles after rain.

Materials and options

Walkway materials

MaterialBest forSlip resistanceInstalled cost
Mortared flagstoneFront entriesGood$28–$40 per sq ft
Dry-laid flagstone stepping stonesGarden pathsGood$45–$85 per stone set
Cut limestone slabsFormal walks, stepsGood (honed)$30–$40 per sq ft
Stabilized decomposed graniteInformal pathsGood when dry$12–$18 per sq ft
Solid limestone block stepsHillsidesExcellent$350–$650 per step

What it costs

What walkways costs

$22–$40 per sq ft

installed for most paved walkways; steps priced per step

Most paved walkways cost $22 to $40 per square foot installed. A 4-foot-wide, 40-foot front walk in mortared flagstone typically lands between $4,500 and $6,500. Decomposed granite paths cost far less; solid limestone steps on a slope are priced per step because each one is set individually on its own base.

Timeline

How long it takes

Most walkways take three days to two weeks on site.

  1. Site walk and layout1 visit
  2. Design and price1–2 weeks
  3. Excavation and base1–3 days
  4. Stone and steps2–7 days
  5. Lighting and planting edges1–2 days

Lighting and edges

A walkway is only finished when the edges are. We set flagstone and limestone walks flush with the lawn or one inch above mulch beds, so mowers run along them and mulch doesn't wash across. Where a walk meets a driveway or porch, we match heights exactly to avoid a trip edge. If you'll want path lights later, we lay conduit under the walk now, which costs far less than coring through finished stone.

Steps that feel right

Outdoor steps should be shallower and deeper than indoor stairs. We build risers around 6 inches and treads at least 14 inches deep, which feel natural on a slope and are safer at night. On long runs we add landings every 6 to 8 steps, and we plan path and step lighting before the stone is set so the wiring is hidden.

Case study

Terraced lake hillside, Canyon Lake

A 30% slope down to a lake view, stabilized with three low limestone terraces, 38 lit steps and a composite deck with cable rail.

“I can walk to the dock at 10 at night with a glass of wine and not think about it. The slope held through two big storms the first spring.”

Gail R., Canyon Lake
Read the case study

Questions

Walkways questions

How wide should a walkway be?

Four feet for a front walk, so two people can walk side by side. Three feet is the minimum for secondary paths. Garden stepping-stone paths can be narrower.

Can you replace a cracked concrete walk?

Yes. We break out and haul away the old concrete, fix the base and build the new walk in flagstone, limestone or pavers. If the walk heaved, we find out why first, usually a tree root or poor drainage.

Is decomposed granite good for walkways?

For garden paths, yes. Stabilized DG on compacted base is firm, permeable and inexpensive. For the main front walk we prefer stone, which doesn't track into the house.

Free · 45 minutes · no obligation

Start with a free site walk

Forty-five minutes on your property with a designer. You'll leave with honest numbers and a clear next step. A fixed-price proposal with a 3D render follows within two weeks.